There is only about one and a half feet left to reach the full level of the dam at the dam, and the overflow gates have been opened.
Infrastructure

There is only about one and a half feet left to reach the full level of the dam at the dam, and the overflow gates have been opened.

It is reported that there is only about one and a half feet left to reach the full level of the water at the Sek Dawgy Reservoir in the northeast of Matara Township, Mandalay Region, and the overflow gates have been open

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.