Geological drilling begins along Rung Sac Road for urban high-speed rail
Infrastructure

Geological drilling begins along Rung Sac Road for urban high-speed rail

Geological drilling has commenced for the Ben Thanh - Can Gio high-speed rail, Ho Chi Minh City's first such project. With a 54km route and a 102 trillion VND budget, the line aims to connect the city center to Can Gio in 13 minutes by late 2028.

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.