Gandara Bridge Collapse Likely Due to Human Error, DPWH Chief Says
Infrastructure

Gandara Bridge Collapse Likely Due to Human Error, DPWH Chief Says

The collapse of a bridge under construction in Gandara, Samar, Philippines, is likely due to human error, with the Public Works and Highways chief pointing to the contractor's unauthorized removal of a component. The incident occurred on a P512-million project.

Read up to 3 eligible full articles per Japan day (JST) for free

Create a free account to open up to 3 eligible full articles per Japan calendar day (JST). Headlines and summaries remain available across ASEAN 7.

  • PetroEnergy's 9-Month Profit Rises 2.6% on Higher Power and Oil Revenues

    Yuchengco-led PetroEnergy Resources Corp. (PERC) reported a consolidated net income of P592 million for the first nine months of the year, a 2.6% increase from the previous year. Higher power generation and oil revenues were the primary drivers of this growth.

  • Pineapple Truck Accidents Claim 4 Lives in Bukidnon

    Two separate road accidents involving pineapple-hauling trucks in Bukidnon, Mindanao, have resulted in four fatalities. The incidents occurred on Wednesday and Thursday, with one involving a motorcycle collision and another a truck rollover.

  • Philippines Urged to Treat Critical Infrastructure as Strategic National Assets

    The Stratbase Institute, a Philippine think tank, has urged the government to strengthen and protect digital infrastructure, transportation connectivity, and water and power supply as "strategic national assets" vital for economic growth, disaster resilience, and national security. The development of the Luzon Economic Corridor presents an opportunity to adopt an integrated approach to safeguarding these interconnected systems.

  • Philippines Sees 13% Rise in Building Permits in September, Signaling Construction Demand Recovery

    Approved building permits in the Philippines rose by 13% year-on-year to 15,534 in September, indicating a resurgence of interest in construction projects, according to the Philippine Statistics Authority. Residential construction led the recovery, accounting for 66% of the total permits.