PLN Assures Stable Electricity Supply for Indonesian Independence Day, Projects 42.6 GW Peak Load
Infrastructure

PLN Assures Stable Electricity Supply for Indonesian Independence Day, Projects 42.6 GW Peak Load

PT PLN (Persero) projects a peak electricity load of 42.6 GW nationwide on Indonesia's Independence Day, August 17, 2026, with a generation capacity of 51.6 GW ensuring a 9 GW reserve. Over 45,000 personnel and extensive equipment are mobilized for a secure supply.

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.