Cambodia, Vietnam Fast-Track Bavet–Moc Bai Expressway Link With 2030 Target
Infrastructure

Cambodia, Vietnam Fast-Track Bavet–Moc Bai Expressway Link With 2030 Target

Cambodia and Vietnam have agreed to accelerate plans connecting their flagship expressway networks at the Bavet–Moc Bai international border crossing, targeting completion by 2030. This initiative aims to strengthen trade and investment and reduce logistics costs between the two nations.

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.