
Metro Manila Eyes Underground Cistern Network for Flood Mitigation
The Metropolitan Manila Development Authority (MMDA) has selected five priority projects as part of a planned network of 39 flood-catchment sites. The agency aims to complete the first batch by June 2027, enhancing preparedness for increasingly intense rainfall due to climate change.
This article requires PRO
This article is outside the free access window or is a special report. PRO unlocks it and the full archive.
Related articles
- Philippine Heatwave Linked to 585 More Preterm Births: Study
A new study estimates that the April 2024 heatwave in the Philippines led to approximately 585 additional preterm births, a 10% increase above average. Climate change is cited as a contributing factor.
- NCR Forecast to Experience Dry Condition by December or January Due to El Niño
The Philippine Atmospheric, Geophysical and Astronomical Services Administration (PAGASA) forecasts that the National Capital Region (NCR) will experience dry conditions with below-normal rainfall starting December or January due to the intensifying El Niño phenomenon. Public advisories on high heat index are also issued.
- Luzon, Visayas brace for rains as easterlies, amihan persist
The Philippine Atmospheric, Geophysical and Astronomical Services Administration (PAGASA) forecasts scattered rains in parts of Luzon and the Visayas due to easterlies and the northeast monsoon. Typhoon In-fa remains outside the Philippine Area of Responsibility.
- San Mateo Farmers Brace for El Niño After Devastating Floods
Farmers in San Mateo, Rizal, Philippines, are facing water scarcity due to El Niño, following devastating crop losses from recent floods. Immediate concerns include recovery costs and drought preparedness.