Laguna Lake Water Level Remains Above Critical-High Mark
Infrastructure

Laguna Lake Water Level Remains Above Critical-High Mark

The water level at Laguna Lake in the Philippines remains above its critical-high mark, raising concerns about potential impacts on Metro Manila. The Laguna Lake Development Authority (LLDA) reported the water level at 12.65 meters, exceeding the critical threshold of 12.50 meters.

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.

  • COA: P17-B infra works have ‘visible defects’; DPWH told to take corrective measures

    The Commission on Audit (COA) has identified "visible defects" in 300 infrastructure projects worth P17.3 billion, urging the Department of Public Works and Highways (DPWH) to implement corrective measures. This was revealed in the 2025 audit report.

  • C5 Road Rehabilitation to Commence Late November

    The Department of Public Works and Highways (DPWH) anticipates commencing the P2.5-billion rehabilitation of Circumferential Road 5 (C5) in late November. The project, designed to minimize disruption to commuters and motorists, will span 420 days with work primarily conducted overnight.

  • DPWH New Chief Vows Project Completion Amid Leadership Shift

    Philippine Department of Public Works and Highways (DPWH) Secretary Giovanni Lopez affirmed the agency's commitment to completing infrastructure projects on schedule, despite leadership changes. He emphasized the priority of restoring a key road damaged by typhoons, fulfilling a pledge to the Filipino people.

  • Over 2,000 Travelers Pass Through Bicol Ports During 'Undas' Exodus

    The 'Undas' travel period in the Philippines' Bicol Region has begun, with over 2,211 passengers passing through ports within six hours on Friday. The Philippine Coast Guard has deployed additional personnel and set up help desks to ensure safe port operations.