
Pyu Creek Dam generates 600 MWH of electricity per day
THE Pyu Creek Dam in Bago Region is currently generating 600 megawatt-hours of electricity per day for the national grid through the 230-kV Toungoo power line during the rainy season, in addition to supporting agricultur
This article requires PRO
This article is outside the free access window or is a special report. PRO unlocks it and the full archive.
Related articles
- Hanthawaddy International Airport Construction Project Steering Committee Formed
The Hanthawaddy International Airport Construction Project Steering Committee has been formed by Order No. 126/2026 issued by the Office of the President. According to the announcement, the Steering Committee is chaired
- Awareness talk on El Niño-related water shortages held in Kawhmu
AN awareness talk on preventing drinking water shortages caused by the El Niño phenomenon was held in Letkhike Village, Kawhmu Township, Yangon Region, on 29 October. The event was conducted by the Department of Rural De
- Zigon Road Paving Works Inspected
OFFICIALS conducted a field inspection yesterday to monitor the progress of the macadam paving project on an internal village road in Tawmyaingsoon Village, Zigon Township, Bago Region. The project is being carried out d
- Mudon inspects precautionary measures to prevent water shortages
OFFICIALS of the Department of Rural Development (DRD), under the Ministry of Cooperatives and Rural Development, conducted a field inspection in Balauk Village, Mudon Township, Mon State, on 29 October to prevent drinki