
Construction of Tran Hung Dao Bridge Accelerates over the Red River in Hanoi
Construction of the Tran Hung Dao Bridge in Hanoi has accelerated, taking advantage of favorable weather. Work is currently focused on erecting bridge piers in the middle of the Red River, with crews working through the night to meet critical deadlines before the upcoming flood season.
This article requires PRO
This article is outside the free access window or is a special report. PRO unlocks it and the full archive.
Related articles
- Hanoi Accelerates EV Bus Rollout, Aims for Diesel Ban by 2035
Hanoi is accelerating its transition to a sustainable public transportation system, with a plan to phase out diesel buses and adopt electric vehicles by 2035. New electric buses have been introduced on two more routes, enhancing passenger comfort and accessibility.
- Dong Thap Strengthens Fishing Vessel Control, Seafood Traceability
Dong Thap Province in Vietnam is intensifying fishing vessel control and seafood traceability as part of its efforts against Illegal, Unreported, and Unregulated (IUU) fishing. Since 2024, the province has reported no fishing vessels violating foreign waters and is enhancing port monitoring and inspections of vessels that lose VMS signals.
- Ho Chi Minh City: Large Dredging Rig Collapses, Causing Major Traffic Gridlock
A large drilling rig used for the Xuyen Tam canal renovation project collapsed in Ho Chi Minh City, blocking the major Bui Huu Nghia street. The incident caused a massive traffic jam during the evening rush hour, prompting authorities to cordon off the site for clearance.
- Vietnam and Panama Forge Ties as Gateways Between Southeast Asia and Latin America
Vietnamese Party General Secretary and President Lam welcomed Panamanian President Mulino's official visit, expressing optimism for renewed momentum in bilateral ties. The visit aims to revive exchanges and foster a more substantive and effective relationship.