Swa Chaung Bridge (return lane) damaged by Sagaing earthquake rebuilt and opened to traffic
Infrastructure

Swa Chaung Bridge (return lane) damaged by Sagaing earthquake rebuilt and opened to traffic

The Swa Chaung Bridge (return lane) on the Yangon-Mandalay Expressway, which was damaged by the powerful Sagaing earthquake in 2025, has been rebuilt and opened to vehicle traffic starting May 14. The 900-foot-long Swa C

This article requires PRO

This article is outside the free access window or is a special report. PRO unlocks it and the full archive.