
AI Data Center Proponent Walks Out of Iloilo Public Consultation Amid Resident Opposition
The proponent of a proposed AI data center in Oton, Iloilo, abruptly left a public consultation after residents voiced strong opposition. The local government has not yet approved the project, raising questions about its future.
This article requires PRO
This article is outside the free access window or is a special report. PRO unlocks it and the full archive.
Related articles
- AI Data Center Project in Iloilo Hits Snag Over Water Supply Concerns
A proposed P20.3 billion AI data center in Iloilo, Philippines, faced a setback when residents raised concerns about its impact on the local water supply during a public consultation. The Norwegian proponent left the meeting without fully addressing these questions.
- Iloilo AI Data Center Project Faces Doubt After Resident Concerns
A proposed P20.3 billion AI data center in Iloilo is facing uncertainty after residents raised concerns during a public consultation. The project proponent walked out of the meeting, casting doubt on its future.